banner

Core Requirements

Build a digital management and control system for the key China-Vietnam BOT power project to ease the power shortage in southern Vietnam and support local economic and social development.

Case Background

A key China-Vietnam capacity cooperation BOT project, it will be transferred to the Vietnamese government free of charge after a 25-year concession to ease the local power shortage.

Application Value and Project Outcomes

  • Achieve full-scenario closed-loop management for thermal power plants.
  • Break information silos and accelerate cross-business data flow.
  • Real-time monitoring mirrors the process parameters of the DCS and auxiliary systems.
  • Performance calculation and deviation analysis visualize energy consumption for operational optimization.

Construction Content

A new-generation SIS based on digital modeling, with core functions including real-time monitoring, trend analysis, performance calculation, performance deviation analysis, alarm management and automatic report generation.

Luculent x Vinh Tan Phase I Power Plant, Vietnam - Digital Platform