Realize integrated and intelligent enterprise management of the power plant based on domestically advanced power units.

Case Background

The largest coal-fired power plant in Bangladesh, it was constructed under EPC mode. Luculent teamed up with China Energy Engineering Corporation to build the PIS/PMS intelligent management system.

Application Value and Project Outcomes

  • Generate precise equipment archives with unified real-time data for decision-making.
  • An equipment analysis center lowers the risk of unplanned downtime.
  • Optimize technical indicators to improve the plant's economic performance.
  • Data-driven automatic maintenance extends equipment service life.
  • Refined cost control supports a cost-leading strategy.

Construction Content

PIS: build a real-time data warehouse for data collection, monitoring, performance calculation and fault diagnosis, delivering key analytical reports for stable and economic unit operation.

PMS: a comprehensive platform covering assets, production, materials, safety, HR and OA, supporting mobile operation, big-data analysis and data-backed management decisions.